Network Gaps North Road

Recently at Cardiff Cycle City, we launched an online survey for our ‘Network Gaps’ campaign to give you the chance to voice your frustrations with Cycling infrastructure in Cardiff. And now, 2 months after that survey went live, we thought it would be a good opportunity to look at a few of the areas mentioned in your responses, to see what they could look like if the infrastructure was improved based on your feedback. 

All the designs shown here are purely hypothetical and don’t represent any actual plans for these areas, but we still think it’s important to show how infrastructure could be improved for cycling to maybe inspire you for how somewhere else could be improved. And if there’s somewhere not shown here you think needs improving, or you think there’s a better way these areas could be improved, you can find the Network Gaps survey here.

North Rd/Boulevard de Nantes Junction

North Rd/Boulevard de Nantes Junction – Current layout

This was the most mentioned area in the survey results so far; and it’s easy to see why. Despite there being a good cycleway further up on the west side of North Road, and a shared use path on the east side, there is currently no easy way to get from the existing cycleway at the junction to either of them. Cardiff council is already planning to move the cycleway to the north side of Boulevard de Nantes, but the key aspect of this design is the continuous cycleway up the west side of the junction, meaning that cyclists could continue up North Road on the left side without needing to stop.

North Rd/Boulevard de Nantes Junction – Proposed Future Layout

Leckwith Rd/Atlas Rd Junction

Leckwith Rd/Atlas Rd Junction – Current Layout

This was another junction where the main complaint was the connections across it, in this case not just for cyclists but also pedestrians. In its current state, the cycleway ends on a blind corner with a narrow pavement, and there are only pedestrian crossings on two of the five connecting roads. The main features of this design are the physically separated cycle lanes on all arms of the junction, although due to the roadway narrowing they would likely all have to end soon after the junction except maybe heading south on Leckwith Road, and pedestrian crossings on all arms of the junction. Also on this design we propose closing off Kitchener Road to car traffic which would improve safety by reducing car traffic in front of the primary school.

Leckwith Rd/Atlas Rd Junction – Proposed Future Layout

Penarth Road

Penarth Road – Current Layout

This was an area which was raised by some people as a potential ‘easy win’ for increasing cycle commuting into Cardiff. Penarth Road is the most direct route from the southern Vale of Glamorgan (Dinas Powys, Penarth, Barry, etc.) into the city centre. But we can tell you from experience that it is not pleasant to cycle along at all, and it’s more than wide enough to fit some good quality cycling infrastructure. Of course it would need to link up well at both ends, but a good cycle link here could help to encourage people to commute by bike from an area which currently likely generates quite a lot of car traffic.

Penarth Road – Proposed Future Layout

Other Network Gaps

Of course, these aren’t the only locations you mentioned. Other popular (or maybe it should be unpopular) areas that you think should be improved included the Ely Trail, the end of the cycleway heading east along Newport Road, and links between the city centre and Cardiff Bay. Thank you all for your responses to the survey, and if there’s still somewhere else you want to see improved, the survey is still available to fill in here.